ScrubAir Home Page
 





Spill Containment

  • Fabricated from 1/4" and 3/8" thick high impact PVC per EPA requirements
  • All corners are heat formed
  • Welds are heat fusion and spark tested for leaks
  • Sumps are dual contained with leak detection per EPA requirements
  • Expansion joints installed for large areas to allow for expansion and contraction
  • In plating process lines ScrubAir installs Schedule 80 eight-inch laser leveled piers filled with concrete to set the beams supporting the tanks up off the corrosive floor environment, and to make cleaning and rinse down maintenance easier




ScrubAir Home Page
 

 ScrubAir Systems, Inc.
 1250 Rose Road
 Lake Zurich, IL 60047
 Ph: (847) 550-8061
 Fx: (847) 550-8062

Web Design by Mir Internet Marketing
Search Engine Optimization by SEO Logic