ScrubAir Home Page
 




Service & Maintenance:

Thirty days after start-up, a ScrubAir technician personally follows up with an onsite visit to make sure the system is operating efficiently and the customer is satisfied.  The EPA requires that a quarterly operation and maintenance checklist be performed for some applications - ScrubAir offers every client a maintenance contract providing a full report of all maintenance completed, and any recommendations for preventative maintenance necessary to meet EPA requirements.  A thorough inspection of each entire system includes:

  • Inspect condition of dump pack for salt or algae build-up on surfaces
  • Manually rinse 1st & 2nd stage of mesh pads (Chrome Separators)
  • Remove spray headers for cleaning, then reinstall
  • Check controls and calibrate if needed
  • Take vibration measurements and grease fan bearings
  • Check and replace hardware, hoses or magnehelic gauges as necessary
  • Inspection of hoods, duct and units for damage or leaking - doing any repairs as required

ScrubAir ventilation systems are quality built to last for many, many years - even in the toughest and most corrosive environments.

Regularly scheduled service and maintenance can make the difference between a customer who will enjoy continual, worry-free production time, or a customer plagued with frequent minor annoyances leading to a clogged system that may eventually need a complete overhaul.  The ScrubAir Service Department is always available to respond promptly to any concern or problem with your ScrubAir ventilation system - anytime!



ScrubAir Home Page
 

 ScrubAir Systems, Inc.
 1250 Rose Road
 Lake Zurich, IL 60047
 Ph: (847) 550-8061
 Fx: (847) 550-8062

Web Design by Mir Internet Marketing
Search Engine Optimization by SEO Logic